Resources
Existing Chemistry Building Condition Assessment
Existing Chemistry Building original documents
Health Sciences Renovation Pre-Design Report
Northwest Quadrant Renovation Phase 1
Northwest Quadrant Renovation Phase 2
Parking & Transportation Study
SWQ Redevelopment Plan Executive Summary
SWQ Redevelopment Plan
SWQ CHM CUN EMS Facility Repair
SWQ Redevelopment Plan – Appendix 8.6 – Campus Fiber Assessment
SWQ Redevelopment Plan – Appendix 8.4.1 – Facility Condition Assessment – CHM
Southwest Quad Open Space Options
Engineering and Neuroscience Building Predesign
Engineering and Neuroscience Building Predesign Appendix
Signage
Office-Room Sign Inserts
Six Inch Template
Nine Inch Template
Twelve Inch Template
Universal Design Reference Material
ADA Barrier Checklist
Bulletin Board Accessibility Guidelines
Light Switch Posterette